How to install overflow system in 6 steps.
by admin | Apr 21, 2020 | Blog 1 |
- Adding rubber gasket-Adding gasket on to the back side of flange will stop water leaking.
- Drill hole in the tank-Use a saw which is 3/4 larger than the fitting size,drill a hole on desired spot. Make sure the surface is flat
- Clean hole-It is important to remove small hairs of plastic from the surface of tank.If these are not removed when gasket is added,water may leak out.
- Insert overflow fitting-Place the fitting in the hole with the curves facing upwards.To get this right,make sure there is screw hole at the top and bottom.
- Screw overflow fitting-Adding the screw maintains pressure.Stop the screw when gasket starts to bulge.
- Add overflow pipe or screen-Now add the screen insert or plumb the pipe